Skip to main content
All CollectionsToken Vesting & Distribution
How do I set up a vesting schedule?
How do I set up a vesting schedule?

Instructions on how to use our vesting schedule feature.

Håkon Øverby avatar
Written by Håkon Øverby
Updated over 2 months ago

How to set up a vesting schedule

What this feature allows you to do

  • Create vesting schedules for deals from start to end.

  • Show a breakdown of all batches (distributions) ahead of time.

  • Get an overview of all your upcoming distributions in the Vesting tab.


How to set up the vesting schedule

  1. Go inside the deal you wish to add vesting for.

  2. Navigate to the Distributions tab and click Create schedule to the right.

  3. Enter the info shown in the module: TGE %, TGE date, Number of batches (excl. TGE), First batch date, and Batch interval.

  4. Click Save vesting schedule to save the changes.

  5. To edit the schedule afterwards click Edit schedule.

Creating schedules with deals and allocations from outside Spring

When you are going to distribute from existing allocations and vesting schedules originating outside of Spring, you need to import these allocations first. Reach out to the Customer Success team on Telegram to get started.

When dates are not determined

If there is information that hasn't been decided yet, such as TGE, you can generate the distribution breakdowns without dates and configure the schedule later.

Multiple vesting schedules

To distribute tokens on a separate vesting schedule, you need to create a separate deal first. A deal can only represent one vesting schedule at a time. You can create unlimited vesting schedules with unlimited deals.

Did this answer your question?